Town of Bridgewater Fee Schedule effective 7/1/2024

Commercial/Industrial/Intuitional Building Permit Fee Schedule

Notes below correspond to Commercial/Industrial/Intuitional Building and Commercial/Industrial/Intuitional Miscellaneous Building Permits:

  •  Demolition value will be based on the current Town of Bridgewater’s assessment. 
  • All fees shall be rounded up to the nearest $1.00. 
  • If a return inspection is required due to faulty work or failure to keep an appointment, a $50.00 re-inspection fee shall be imposed. 
  • Estimated construction cost will be rounded up to the nearest $1,000. 
  • The Building Department reserves the right question the estimated Construction Cost. 
  • The above-listed permit fee shall be doubled where work requiring a permit has commenced prior to permitting; however, payment of such a fee shall not affect the penalty for violation prescribed in Chapter 1, Section 114.4 of the MA State Building Code. Starting work without a permit may be subject to non-criminal citation issued by the Bridgewater Building Department.
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
License/Permit/Fee
New Building $16/$1,000 - Minimum $500
Addition/Alteration $16/$1,000 - Minimum $300
Mechanical $16/$1,000 - Minimum $100
Sheet Metal $16/$1,000 - Minimum $100
Fire Alarm $16/$1,000 - Minimum $100
Demolition (Based on current Town Assessment) $5/$1,000 - Minimum $300
Solar $16/$1,000 - Minimum $300
License/Permit/Fee
Minor alteration ex: replace door, window or small repair valued under $1,000
$100
Accessory structures 150 sq ft and up $12/$1,000 – Minimum $200
Shed 150 sq ft or less $12/$1,000 – Minimum $75
Above Ground Pool $12/$1,000 – Minimum $150
Inground Pool $16/$1,000 – Minimum $200
Communications Tower/Antenna $12/foot + $300 per carrier – Minimum $300
Tents/Trailer $100 per tent/trailer
Decks $16/$1,000 – Minimum $75 
Roofing $16/$1,000 – Minimum $300
Signage $10/$1,000 – Minimum $50
Stove Permit $100
Zoning Determination Certificate $50
Start Work Without a Permit Triple permit Fee
Duplicate Permit Card $30
Re-Inspection Fee $100
Temporary Occupancy Permit $100 per unit – Minimum $100
Occupancy Permit $100 per unit – Minimum $100
Certificate of Inspection per 780 CMR $200 up to 4 units + $50 per unit after 4
Fire Inspection Fee $100 up to 4 units + $50 per unit after 4
Emergency Inspection Outside of Office Hours (When called out by Fire Department or Utility Company)  $75.00, or fraction thereof, 4-hour min.
DBA Certificates requiring Inspections $100

Commercial Electrical Fees

  • The Electrical Inspector reserves the Right to establish fair market value of work in order to calculate permit fee. Calculation results in fraction of dollar, fee is founded to the next dollar. 
  • All work shall be done in accordance with the requirements of the Massachusetts Electrical Code and Regulations of National Grid. Service entrance locations must be obtained from National Grid.  
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
License/Permit/Fee
All Work under this category unless specifically listed below $ 150.00 plus 2% of value of work * 
Institutional Permits for Maintenance and Alterations, Per chapter 141, Section 8 MGL Minimum (first person)  300.00/year 
Institutional Permits for Maintenance and Alterations, Per chapter 141, Section 8 MGL For each additional person performing electrical work  225.00/year 
Electric Signs  $200.00
Burglar Alarm $ 150.00 plus 2% of value of work
Fire Alarm $ 150.00 plus 2% of value of work
Solar – (must have copy of contract) $ 300.00 plus 2% of value of work 
Carnivals, Circuses, Tents $100.00
Reinspection for Failed Inspection $100 in Advance
Failure to Apply for a Permit  Triple Permit Fee
Inspection Outside of Office Hours $100.00, 4-hour min.

Commercial Plumbing and Gas Fees

  • All Gas Permits requiring a test will be charged for the test as 1 fixture. 
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
License/Permit/Fee
Plumbing $ 125 for application plus $25.00 per fixture
Gas $ 125 for application plus $25.00 per fixture
Water Heating (Only fixture on Permit) Plumbing $120.00
Water Heating (Only fixture on Permit) Gas $120.00
Water Heating Electric (Requires Wiring Permit) 100.00 + 2% of the value of the job. 
Sewer Connection (Submit on separate plumbing permit application and obtain registration number from Sewer Department ) $100.00
Re-Inspection $75.00
Failure to Apply for Permit Triple Permit Fee
Emergency Inspection Outside of Office Hours (When called out by Fire Department or Utility Company) 100.00, or fraction thereof, 4-hour min.

Residential Building Permit Fees

Notes below correspond to Residential Building and Residential Miscellaneous Building Permits:

  • Demolition value will be based on the current Town of Bridgewater’s assessment. 
  • All fees shall be rounded up to the nearest $1.00.
  • If a return inspection is required due to faulty work or failure to keep an appointment, a $50.00 re-inspection fee shall be imposed.
  • Estimated construction cost will be rounded up to the nearest $1,000.
  • The Building Department reserves the right to question the estimated Construction Cost.
  • The permit fee shall be doubled where work requiring a permit has commenced prior to permitting; however, payment of such a fee shall not affect the penalty for violation prescribed in Chapter 1, Section 114.4 of the MA State Building Code. Starting work without a permit may be subject to non-criminal citation issued by the Bridgewater Building Department.
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
License/Permit/Fee
New Dwelling $12/$1,000 – Minimum $500
Addition/Alteration $12/$1,000 – Minimum $100
Mechanical $12/$1,000 – Minimum $100
Fire Alarm $12/$1,000 – Minimum $100
Demolition (based on current Town Assessment) $2.50/$1,000 – Minimum $100
Solar $12/$1000 - Minimum $100
License/Permit/Fee
Accessory structures 150 sq ft and up $12/$1,000 – Minimum $100
Shed 150 sq ft $12/$1,000 – Minimum $100
Above Ground Pool $16/$1,000 – Minimum $200
Inground Pool $16/$1,000 – Minimum $300
Tents/Trailer $75 per tent/trailer – Minimum $75
Decks $12/$1,000 – Minimum $150
Roofing 1% of Value -- Minimum $100.00
Siding 1% of Value -- Minimum $100.00
Stove Permit $75
Zoning Determination Certificate $50
Start Work Without a Permit Triple Permit Fee
Duplicate Permit Card $30
Re-Inspection Fee $100
Temporary Occupancy Permit $50 per unit
Occupancy Permit $50 per unit
Multi-Family Certificate of Inspection per 780 CMR $200 up to 4 units + $50 per unit after 4
Fire Department Inspection Fee $100 up to 4 units + $30 per unit after 4
DBA Certificates requiring Inspections $100
Emergency Inspection Outside of Office Hours (When called out by Fire Department or Utility Company)  $ 75.00, or fraction thereof, 4-hour min.

Residential Electrical Permit Fees

  • The Electrical Inspector reserves the Right to establish fair market value of work in order to calculate permit fee. Calculation results in fraction of dollar, fee is founded to the next dollar.
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
  • All work shall be done in accordance with the requirements of the Massachusetts Electrical Code and Regulations of National Grid. Service entrance locations must be obtained from National Grid. 
  • Permit number must accompany all inspection requests. Permits are valid for one year from the date of issue. Permit applicants are required to arrange for inspections upon completion of work. MGL 143 3L
License/Permit/Fee
Single Family Dwelling, including Service $275.00
Duplex Dwelling Two Family Dwelling Units $400.00
Additions or Rewiring Existing $125.00
Add Outlets to Existing Dwelling $85.00
Install Burglar Alarm or Low voltage Wiring $100.00
Oil Burners or Gas Heating System $85.00
Air Conditioning/Heat Pump System $125.00
Major Appliances (Installed at same time) $85 each
Swimming Pool: Above Ground $125.00
Swimming Pool: In-ground $175.00
Wells $125.00
Residential Generator $125.00
Hot Tub $100.00
Pool Shed/Cabana $125.00
Storage Shed/Detached Garage $125.00
Solar Panels $300.00
EV Car Charger $100.00
Energy Storage System $150.00
New, Replace Existing or Upgrade Service $125.00
Temporary Service $100.00
Disconnect and Reconnect for Siding Service $100.00
Reinspection $100.00
Failure to Apply for a Permit Triple Permit Fee
Emergency Inspection Outside of Office Hours (When called out by Fire Department or Utility Company $ 100.00, 4-hour min.

Residential Plumbing and Gas Fees

RESIDENTIAL - (Anything more than a three-family dwelling is considered to be commercial) 

  • All Gas Permits requiring a test will be charged for the test as 1 fixture. 
  • Paper applications are accepted; however, an additional $50.00 administrative fee will be applied.
License/Permit/Fee Current Amount
Plumbing $50.00 for application plus $15.00 per fixture $65.00 for application plus $15.00 per fixture
Gas $50.00 for application plus $15.00 per fixture $65.00 for application plus $15.00 per fixture
Water Heating (Only fixture on Permit) Plumbing $60.00 $70.00
Water Heating (Only fixture on Permit) Gas $60.00 $70.00
Water Heating Electric (Requires Wiring Permit) $75.00 $75.00
Sewer Connection (Submit on separate plumbing permit application and obtain registration number from Sewer Department ) $60.00 $60.00
Re-Inspection $60.00 $75.00
Failure to Apply for Permit Double Permit Fee Triple Permit Fee
Emergency Inspection Outside of Office Hours (When called out by Fire Department or Utility Company) 75.00, or fraction thereof, 4-hour min. 75.00, or fraction thereof, 4-hour min.